CONSTRUCTION WORKS FOR THE ERECTION OF A 132KV CLOSED TRANSMISSION SUBSTATION GIS MARI

The project concerns the construction of a new 132kV Gas Insulated Substation (GIS) for the Electricity Authority of Cyprus in the Mari area. This particular substation constitutes a critical energy hub for strengthening and upgrading the region’s electricity network, ensuring the safe and reliable transmission and distribution of electrical power.

The implementation of the project requires a wide range of technical works, including:

  • Demolition of existing structures
  • Earthworks
  • Installation of formwork and reinforcements
  • Concrete works
  • Construction of masonry and plastering
  • Installation of flooring, insulation, and painting

The project is being carried out in line with the highest safety and quality standards, contributing to the improvement of Cyprus’s energy infrastructure and enhancing the resilience of the electricity network.